an expansion from the hydropower from the Snowy mountains. It can be touted as 2000GW pumped storage generator with 350GWh storage – less than every day’s electricity to the NEM. It had been originally costed as $2B and it absolutely was to become finished by now. Cost is already over , growing the likelihood of these tripping normally when th